Complexity units

Every item gets one size, scored once after refine and before any repo work: complexity × reach × assurance, in complexity units.

What it is

The estimate stage scores three dimensions, each a Fibonacci step with no top (1, 2, 3, 5, 8, 13, 21, …). Complexity is how hard the change is to get right. Reach is what it touches and what breaks if it is wrong. Assurance is what it takes to know it works. The units are the product of the three: 3 × 5 × 3 is 45 units.

Why it matters

It gives every item one comparable size, scored with one rubric and one model across the whole org, so 45 units on one product means what it means on another. The score is stored on the item and written back to its issue.

How it works

  1. Scored at the right moment

    The estimate stage sits right after refine in the default product workflows and always before the split. A misplaced estimate is moved back in front of decompose, because after the split it would be scoring finished work.

  2. The agent reads the code

    The estimating agent gets read-only clones of every member repo and must end with a structured estimate block. An unreadable reply gets one corrective lap, and an estimate that still cannot be read never blocks the item: the stage has no gate.

  3. No human override

    No route or tool sets a score by hand. A wrong score is fixed by tuning the rubric, which bumps its version (currently cu-2), and scores are compared only within one rubric version.

  4. Shown, not acted on yet

    Today the estimate is shown on the item in the console and in the agent tools. Nothing gates, schedules or limits concurrency on it.

Where it fits in the loop

  1. intent
  2. triage
  3. refine
  4. estimate
  5. decompose
  6. build
  7. review
  8. release
  9. observe

Between refine and decompose. The spec is settled, so there is something to size, and no repo work has started.